Stadium renovation required massive opening for heavy machinery access with high-security standards, anti-climb features; extra-large and heavy gate posed significant installation challenges, needing precise alignment and long-term durability in UK's wet climate.
Supplied and installed heavy-duty industrial cantilever sliding gates (2 sets): 12.0m clear opening x 2.5m height; 120x120mm heavy-duty SHS frame with 25x25mm solid steel bar infill; integrated sawtooth/shark-tooth top rail for anti-climb security; epoxy zinc-rich primer + polyester powder coating (black) for superior corrosion resistance; crane-assisted precise installation for alignment and stability.
Project completed on schedule with high quality; gates operate smoothly for heavy machinery access; anti-climb and robust design greatly enhanced stadium security; withstood UK's wet climate long-term with no rust or fading; high client satisfaction on precision installation, security, and durability, providing a reliable access solution for the arena renovation.
Contact our engineering team today for a free consultation and quote.